Classify every leg of a journey — bilateral, transit, cabotage or cross-trade — track what each Member State then wants of it, and hold the pack for the transport manager who lodges.
A leg runs from the State of establishment and back, and Directive (EU) 2020/1057 exempts it.
02
A third stop joins that journey, and the additional-activity tolerance widened on 21 February 2024.
Reason
03
A cabotage job is taken, and the declaration belongs in the system before the posting begins.
04
A cross-trade run links two Member States, neither of them where the operator is established.
05
A journey only crosses a Member State, and transit with no loading or unloading is no posting.
Decide
06
A journey meets a roadside check, and no document beyond the closed list may be asked of a driver.
07
A posting ends, and a host-State request through the information system leaves eight weeks to answer.
Out
08
A van above the mass threshold crosses a border, and Article 2(1)(aa) has applied since 1 July 2026.
09
Execute write actions only inside the approval boundaries agreed during implementation.
→Product statement
The agent classifies each leg and tracks what every Member State on it then wants. A named transport manager lodges the declaration; the driver operates the tachograph.
Example workflow
One journey, leg to lodgement
AgentHuman
1Journey legs receivedTransport orders, consignment notes, vehicle registrations and tachograph downloads
2Leg context assembledThe driver, the vehicle, the Member States a leg touches and the day it ran
3Posting status draftedThe legs, the status each one creates, the gaps and completeness
4Controls appliedStatus checks, tolerance checks, country-symbol checks and completeness confidence
No human action required
Stages 1 to 4 run unaided, and nothing is lodged at any of them — the agent is classifying, and the compliance lane opens at the completeness gate.
5DecisionSplits at the completeness gate
Status settled
Goes to the transport manager to lodge.
Anything ambiguous
Adds a compliance-desk read first.
Compliance review
The journey is held with its legs, its gaps and the Member States they touch.
Lodge · Append evidence · Send to the compliance desk
Lodged — by the transport manager, named▼
6Journey and driver records updatedOnly where write access and records policy allow it
7Outcome evaluatedStatus accuracy, tolerance coverage, desk corrections and what review found
Corrections
Each compliance-desk correction is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required8 items
Deciding that a leg is bilateral and not a posting.
Lodging the declaration before a posting begins.
Answering a host-State request in the system.
Operating the tachograph or entering a country symbol.
Automation boundaryAgent acts unaided
✓Mark each leg with the status it creates and the states it touched.
✓Track what every Member State on the journey then wants.
✓Count each additional loading activity already spent.
✓Flag the van that came into scope when Article 2(1)(aa) began to apply.
Nothing is lodged or answered except by a named person, inside agreed boundaries.
Judging which employment law governs a driver.
Telling an inspector that a journey was exempt.
Setting the operation type a journey is filed as.
Changes to journey, driver or vehicle records.
Example output
One journey leg, annotated
Our dispatch and routing agent plans against the hours already recorded; this record is what one leg of a journey created.
Journey state · single legIllustrative example
Leg
Recorded as
Operation type
Source of record
Confidence
Held for
Third stop, unloaded in Lyon
Posted status created, declaration due
Cabotage
Consignment note, 3 August 2026
Held unlodged
The transport manager, by name
As receivedTaken from the consignment note and the card download — it reaches as far as those sources do.
What the record holdsConsignment note dateCountry symbols readDeclaration reference
Why no status call hereWhether a leg is a posting is a Directive 2020/1057 call, not a model output.
ActionLodgeAppend evidenceSend to the compliance desk
What the score decidesBelow the configured threshold the journey picks up a desk read before the manager sees it.
Value
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value landsValue 01 – 04
Every legFrom the journey that ran it
03Status
Where the status is used
Our hours-of-service records agent works the United States document a driver signs; a fleet doing both keeps two record sets that do not translate.
01Approved path
The leg decides the status
Cabotage makes a driver posted and a bilateral leg does not, whatever the journey was planned to be.
02Human review
What was checked, and not found
No further EU road-transport change taking effect in 2026 turned up, and that search covered only the tachograph and posting provisions — read it as not checked rather than as nothing there. Market access for these vehicles has been required since 21 May 2022, so confirm the Community licence too.
04Build an evidence trail
The leg, the status it created and the person who lodged the declaration stay on the record.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Journey and order recordsTransport orders · consignment notes Vehicle registrations
Tachograph dataCard and vehicle-unit downloads Country symbol entries
Employment and pay recordsContracts · payroll Timesheets and proof of pay
Agent
EU posting and tachograph
Reads the legs Tracks each state Holds for the manager
Declaration and request recordsPublic interface submissions Information-system requests
A state-level status-accuracy figure can read clean while cabotage legs in France carry most of the corrections. Nestack reports the correction rate by Member State, not only in total.
Slice performance — reported separately, not only in aggregateIllustrative example
Slice
Failure rate
Lift
Lift vs. threshold
Status
Cabotage legs in France
6.4%
3.6×
Review
Cross-trade legs in Germany
4.6%
2.6×
Review
Bilateral legs with two stops
2.9%
1.6×
Watch
Transit through Austria
1.2%
0.7×
Normal
Bar: correction-rate lift vs. Austrian transit baseline · scale 0–4.0× · tick marks the 2.0× review threshold2 of 4 slices over threshold
Evidence-linked improvement
What a mistaken bilateral costs
A cycle ends when the mistaken bilateral leg is a standing case. That suite is what the next journey mapped is measured against.
Improvement cycle · five stagesSwitchback — the path turns at Improve and returns at Learn
01Detect
Correction rate rises on cabotage legs in France.
02Diagnose
The third stop that turned a bilateral run into a posting nobody declared is read back until one cause remains.
03Improve
Every change leaves numbered, with the journeys that caused it filed beneath.
04Verify
A single red journey case is enough to keep the release back.
05Learn
The case is permanent, and the status rules are rewritten with it.
Learn → DetectThe return edge. The next journey is measured against a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, status mapping, evaluation, integration, then production validation and handover.
WorkstreamWeek 1Week 2Week 3Week 4Week 5Week 6
01Journey-status discovery and automation-boundary work.
02Order, tachograph and payroll sources.
03Leg-to-operation and Member-State duty mapping.
04Journey and leg ingestion.
05Driver, vehicle and state binding.
06Completeness scoring and review routing.
07Transport-manager lodgement workflow.
08Journey and tachograph-system integration.
09Status and tolerance cases.
10Guardrails and lodgement controls.
11Journey-trail instrumentation.
12Deployment, documentation and Agent Care handover.
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallelFinal scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
Capability✓ in scope · — not at this tierPilotOne Member State, one yearProductionProduction posting workflowAdvancedMultiple states / operators
Introduced at Pilot
Status mapping to your journeys✓✓✓
Transport-manager release✓✓✓
Operation-type baseline✓✓✓
Introduced at Production
Reporting by member state—✓✓
Lodgement workflow in your systems—✓✓
Approved write-back—✓✓
Tachograph-record integration—✓✓
Introduced at Advanced
Multi-state operations——✓
Cross-state evidence packs——✓
Large journey volumes——✓
Multi-state posting controls——✓
Build priceFrom $5,000From $8,000Custom quote
Final build priceConfirmed after discovery based on integrations, workflow complexity, journey volume, approval controls and deployment requirements.
Separate from buildBuild pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bringWe build with it
01Your journeys and the states they touch→Journey mapping and leg captureWeek 1
02Representative orders, notes and card downloads→Source binding, status logic and the operation-type baselineWeek 2
03Your State of establishment and the licences held→Status mapping, journey binding and the automation boundaryWeek 1
04Access to relevant APIs, feeds or exports→Order, tachograph and payroll-source assessment, then integration setupWeek 2
05Journeys you would not want declared→Status cases and failure-mode testingWeek 4
06What no posting declaration may cover→Completeness scoring, review routing, guardrails and release controlsWeek 3
07A named transport manager to lodge→Transport-manager workflow, then pilot and production validationWeeks 5–6
Nothing else is requiredDeployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
Every bar is the true working span of a phase, so the fifth week has to hold two of them in here.
PhaseW1W2W3W4W5W6
DiscoveryW1
BuildW2 – W3
EvaluateW4 – W5
Pilot & LaunchW5 – W6
Week focusW1Journey discovery, status mapping and the automation boundaryW2Source integration and the operation-type baselineW3Leg classification, tolerance logic and release controlsW4Evaluation suite, status cases and failure-mode testingW5Record integration, pilot journeys and targeted correctionsW6One posting year run under the transport manager, then Agent Care handover
Reading the bandEach bar spans only the weeks its own work is named for. The fifth week holds a pair because the work does.
At the end of W6Once the journey record validates, Agent Care takes over the watch.
DurationSix-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Transportation AI agent
Build a posting agent around the leg that decides the status, not the plan that preceded it.
Show us one journey and the legs it is made of. Send the week that worried you and we will map each leg to the status it creates, before the next declaration falls due. A United States hours record signed by the driver is a different agent.