Engineering-Change & Configuration-Integrity AI Agent
Carry a change through review, then check whether the same revision and effectivity are live in the ERP routing, the MES work instruction and the supplier portal — and flag where they are not.
A change is raised, and the parts, documents, routings and open orders it touches are assembled with it.
02
A packet arrives thin, and the missing categorisation, justification and implementation plan are named.
Reason
03
A change waits on one over-subscribed reviewer, and the queue is chased there, not across the board.
04
A change is released in PLM, and the ERP change master, the MES routing and the work instruction are read back.
05
An effectivity date passes, and the revision the cell is building is compared with the one the order carries.
Decide
06
An effectivity type differs between systems — date here, serial there — and the mismatch is raised, not averaged.
07
An open order cites the superseded drawing, and the supplier side is in scope — SAE EIA-649C (2019) puts it there.
Out
08
A divergence is found, and it is routed with both records behind it to the named change authority.
09
Execute write actions only inside the approval boundaries agreed during implementation.
→Product statement
The agent reports where the change stands; ISO 10007:2017 leaves the verification with a dispositioning authority, and a named person dispositions the stock.
A company-wide agreement rate can look settled while one or two systems carry most of the divergence. Nestack reports the divergence rate by slice, not only in total.
Slice performance — reported separately, not only in aggregateIllustrative example
Slice
Failure rate
Lift
Lift vs. threshold
Status
MES work instructions
6.7%
3.5×
Review
Supplier portal and open POs
4.6%
2.4×
Review
Inspection and control plans
3.3%
1.7×
Watch
ERP item master and BOM
1.8%
0.9×
Normal
Bar: divergence-rate lift vs. ERP-item-master baseline · scale 0–4.0× · tick marks the 2.0× review threshold2 of 4 slices over threshold
Evidence-linked improvement
Each cycle ends in a new case
A cycle closes when the change that never landed is a regression case the next release must pass. That suite is what the next order tracked is measured against.
Improvement cycle · five stagesSwitchback — the path turns at Improve and returns at Learn
01Detect
Divergence rate rises in one system.
02Diagnose
The cell that built to a revision the change board retired in April is read back until one cause is left.
03Improve
The fix gets a number, and the change orders that raised it are held against it.
04Verify
No release while a touched effectivity case is outstanding; it reruns until green.
05Learn
The case stays for good, and the systems it spans are recorded against it.
Learn → DetectThe return edge. The next order is tracked against a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, cross-system reconciliation, evaluation, integration, then production validation and handover.
WorkstreamWeek 1Week 2Week 3Week 4Week 5Week 6
01Change workflow discovery and boundaries and boundary definition.
02PLM, ERP, MES and portal assessment.
03Effectivity, baseline and route mapping and rule mapping.
04Change-order ingest and system mapping.
05Cross-system comparison and binding.
06Confidence scoring and gap routing.
07Authority release workflow.
08ERP, MES and portal integration.
09Effectivity and revision cases.
10Guardrails and release controls.
11Change-trail instrumentation.
12Deployment, documentation and Agent Care handover.
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallelFinal scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
Capability✓ in scope · — not at this tierPilotOne change board, one plantProductionProduction PLM, ERP and MESAdvancedMultiple plants / systems
Introduced at Pilot
Reconciliation across your systems✓✓✓
Authority release✓✓✓
Revision-agreement baseline✓✓✓
Introduced at Production
Reporting by system—✓✓
Release workflow in your systems—✓✓
Approved write-back—✓✓
PLM and ERP integration—✓✓
Introduced at Advanced
Multi-customer approval routes——✓
Multi-stage board approvals——✓
High change volume——✓
Multi-system configuration controls——✓
Build priceFrom $5,000From $8,000Custom quote
Final build priceConfirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
Separate from buildBuild pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bringWe build with it
01Your change process and who sits on the board→Change-order ingestion and system mappingWeek 1
03Your effectivity rules and customer approval routes→Effectivity, baseline and customer-route mappingWeek 1
04Access to relevant APIs, feeds or exports→PLM, ERP, MES and portal assessment, then integration setupWeek 2
05Changes you would not want released→Divergence cases and failure-mode testingWeek 4
06What no release may go out without→Confidence scoring, gap routing, guardrails and release controlsWeek 3
07A named change authority to release changes→Authority release workflow, then pilot and production validationWeeks 5–6
Nothing else is requiredDeployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
The weeks are drawn from the change board, so the fifth carries evaluation and the pilot together.
PhaseW1W2W3W4W5W6
DiscoveryW1
BuildW2 – W3
EvaluateW4 – W5
Pilot & LaunchW5 – W6
Week focusW1Change workflow discovery, route mapping and the automation boundaryW2System integration and the reconciliation baselineW3Cross-system comparison, confidence logic and release controlsW4Evaluation suite, effectivity checks and failure-mode testingW5Portal and MES integration, pilot changes and targeted correctionsW6One change board run under the configuration lead, then Agent Care handover
Reading the bandA bar runs across the weeks its work is named in and no further. The week 5 overlap is real.
At the end of W6Validation closes on live orders, and Agent Care picks up monitoring.
DurationSix-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Manufacturing AI agent
Build a configuration-integrity agent around your change board.
Show us one released change and where it should have landed. Ask the planner who cut last week's orders which revision his routing gave him — that answer is the one we keep current.