Bind each entity clock in 49 CFR Parts 191, 192 and 195 to the record it consumed — the confirmed discovery, the thirty-day report, the fifteen-month manual review. No officer certifies any of it.
A discovery is confirmed, and 49 CFR 191.5(a) leaves no more than one hour to telephone the notice.
02
A liquid accident is called in, and § 195.52 wants revised estimates or confirmation within 48 hours.
Reason
03
A detection is logged, and § 191.15 allows 30 days for the report; § 195.54(b) adds a supplemental.
04
A manual review falls due, and § 192.605(a) caps the interval at 15 months, once each calendar year.
05
A gas annual report closes, and § 191.11 still says 15 March — the move to June was withdrawn.
Decide
06
An evaluation falls due, and § 192.805 leaves the interval to the operator plan, not to Part 192.
07
A reassessment is scheduled, and § 192.939 says 7 calendar years; § 195.452(j)(3) says 68 months.
Out
08
A distribution programme ages, and § 192.1007 wants re-evaluation at least every five years.
09
Execute write actions only inside the approval boundaries agreed during implementation.
→Product statement
The agent assembles and tracks entity clocks. No officer certifies under Parts 191 to 195 — the operations manager releases, and the operator answers.
Example workflow
One clock, discovery to release
AgentHuman
1Clock record receivedDiscovery times, inspection results, qualification records or report drafts
2Clock context assembledThe segment, the section setting the deadline and whether repair is immediate, 60-day or 180-day
3Record set draftedThe clock, its records, the gaps and completeness
4Controls appliedDeadline checks, record-sufficiency checks, date checks and completeness confidence
No human action required
Stages 1 to 4 run unaided, and nothing is filed at any of them — the agent is assembling, and the compliance lane opens at the completeness gate.
5DecisionDivides at the completeness gate
Record sufficient
Goes to the operations manager to release.
Anything thin
Adds a pipeline compliance read first.
Compliance review
The set is held with its clock, its gaps and the segments they sit on.
Release · Append record · Send to compliance
Released — by the operations manager▼
6Segment and qualification records updatedOnly where write access and records policy allow it
7Outcome evaluatedRecord completeness, clock coverage, compliance corrections and what review found
Corrections
Each compliance correction is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required8 items
Determining that an event is reportable.
Telephoning the National Response Center.
Filing an incident, accident or annual report.
Setting the intervals in the qualification plan.
Automation boundaryAgent acts unaided
✓Hold the record each entity clock consumes, with the date it carries.
✓Track each clock against the section of Part 191, 192 or 195 that sets it.
✓Flag the 48-hour liquid follow-up that compliance calendars routinely omit.
✓Read the re-evaluation interval out of the operator qualification plan.
Nothing is reported or filed except by a named person, inside the agreed boundaries.
Judging whether a repair condition was met.
Telling PHMSA the operator is in compliance.
Choosing the reassessment method for a segment.
Changes to pressure, alignment sheets or field records.
Example output
One clock, annotated
Our grid asset maintenance copilot holds a finding for the named engineer; this record is what one entity clock consumed.
Record set · single clockIllustrative example
Clock
Recorded as
Segment
Record on file
Confidence
Held for
Written report, § 191.15
Drafted from the detection date, not filed
Regulated onshore gathering
Operator detection log, 6 August 2026
Held unfiled
The operations manager, by name
As receivedTaken from the detection log and the incident file — it reaches as far as those sources do.
What the record holdsConfirmed discovery timeWho confirmed itSupplemental, dated
Why no reportability callReportability is a § 191.15 judgement for the operator, not a model output.
ActionReleaseAppend recordSend to compliance
What the score decidesUnder the configured threshold a compliance read comes first, and only then the manager.
Value
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value landsValue 01 – 04
Every clockFrom the segment that owes it
03Record
Where the record is used
Our compliance reporting assistant works a register and names no regime, and our control room copilot works operations; this page is one regime and its statutory records.
01Approved path
No officer signs any of it
§ 192.939 states one maximum reassessment interval of 7 calendar years; the stress-tiered figures come from ASME B31.8S, incorporated by reference.
02Human review
What was checked, and not there
No named-officer certification appears anywhere in the pipeline safety regulations, and no leak detection final rule was confirmed as published.
04Build an evidence trail
The record, the clock it started and the person who confirmed discovery stay on the file.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Reporting and notificationNRC hotline · PHMSA portal Incident and accident reports
Integrity managementILI · direct assessment Reassessment records
Operator qualificationQualification plan · training Evaluation records
Agent
Pipeline integrity records
Reads the clocks Assembles the record Holds for the manager
Work and asset systemsGIS · work management Leak, repair and survey records
A segment-level interval-provenance figure can read clean while regulated onshore gathering carries most of the corrections. Nestack reports the correction rate by segment, not only in total.
Slice performance — reported separately, not only in aggregateIllustrative example
Slice
Failure rate
Lift
Lift vs. threshold
Status
Regulated onshore gathering
7.4%
3.6×
Review
Gas distribution mains and services
5.3%
2.6×
Review
Hazardous liquid line pipe
3.3%
1.6×
Watch
Gas transmission in HCAs
1.7%
0.8×
Normal
Bar: correction-rate lift vs. HCA gas transmission baseline · scale 0–4.0× · tick marks the 2.0× review threshold2 of 4 slices over threshold
Evidence-linked improvement
What a borrowed interval costs
A cycle closes when the borrowed interval is a regression case. That suite is what the next record kept is measured against.
Improvement cycle · five stagesSwitchback — the path turns at Improve and returns at Learn
01Detect
Correction rate rises on regulated onshore gathering.
02Diagnose
The re-evaluation cycle everybody quoted and nobody could find in § 192.805 is read back until one cause remains.
03Improve
Changes go out numbered, and the segments that drove them ride along.
04Verify
One segment case still failing keeps the release where it is.
05Learn
It joins the suite for good, and the interval rules move in the same commit.
Learn → DetectThe return edge. The next clock is measured against a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, evidence assembly, evaluation, integration, then production validation and handover.
WorkstreamWeek 1Week 2Week 3Week 4Week 5Week 6
01Entity-clock discovery and automation-boundary work.
02Detection, inspection and plan sources.
03Clock-to-section and segment-record-coverage mapping.
04Clock record ingestion.
05Segment, section and record binding.
06Completeness scoring and review routing.
07Manager release workflow.
08Work and asset-system integration.
09Interval-source and clock cases.
10Guardrails and record-keeping controls.
11Record-trail instrumentation.
12Deployment, documentation and Agent Care handover.
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallelFinal scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
Capability✓ in scope · — not at this tierPilotOne segment type, one yearProductionProduction compliance workflowAdvancedMultiple segment types / operators
Introduced at Pilot
Record assembly to your clocks✓✓✓
Operations manager release✓✓✓
Interval-provenance baseline✓✓✓
Introduced at Production
Reporting by segment—✓✓
Release workflow in your systems—✓✓
Approved write-back—✓✓
Work-management integration—✓✓
Introduced at Advanced
Multi-operator registrations——✓
Cross-part record packs——✓
Large segment inventories——✓
Multi-mode deadline controls——✓
Build priceFrom $5,000From $8,000Custom quote
Final build priceConfirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
Separate from buildBuild pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bringWe build with it
01Your segments and the parts they fall under→Segment mapping and clock captureWeek 1
02Representative detection, inspection and qualification records→Record binding, clock logic and the interval baselineWeek 2
03Your qualification plan and the individuals § 192.807 records→Clock mapping, segment binding and the automation boundaryWeek 1
04Access to relevant APIs, feeds or exports→Detection, inspection and plan-source assessment, then integration setupWeek 2
05Records you would not want relied on→Interval cases and failure testingWeek 4
06What no operator record may settle→Guardrails, release controls, completeness scoring and review routingWeek 3
07A named operations manager to release→Manager release workflow, then pilot and production validationWeeks 5–6
Nothing else is requiredDeployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
Each band is the honest length of one phase in working weeks, and that is why a week carries two.
PhaseW1W2W3W4W5W6
DiscoveryW1
BuildW2 – W3
EvaluateW4 – W5
Pilot & LaunchW5 – W6
Week focusW1Clock discovery, segment mapping and the automation boundaryW2Source integration and the interval-provenance baselineW3Record assembly, clock logic and release controlsW4Interval cases, failure-mode testing and the evaluation suiteW5Record integration, pilot segments and targeted correctionsW6One reporting year run under the operations manager, then Agent Care handover
Reading the bandEach bar runs only across the weeks its own work is named for. The fifth week doubles because the work does.
At the end of W6Once the operator record validates, Agent Care picks up the agent.
DurationSix-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Energy AI agent
Build a pipeline records agent around the clocks Parts 191 to 195 already run.
Show us one confirmed discovery and what it started. Who certifies the annual report? No one — no officer is named, so the record answers alone. The dam safety agent tracks a person and a signature; this one tracks entity clocks, and deregulation has not relaxed enforcement.