Carry the authorization file per model — the grant, the test lab, the responsible party, the US agent — and watch the lists that can re-open a certification already signed.
A grant is filed, and 47 CFR 2.911(d)(5) fixes what the applicant certified on that date.
02
A listing changes afterwards, and 2.911(d)(6) forces a new written and signed certification.
Reason
03
A listing lands in a PSHSB Public Notice; the FCC Covered List webpage served a September 2024 page.
04
A category listing reaches foreign-produced routers, prohibited by default since DA 26-278.
05
A prohibited-entity check reads every list FCC 25-27 names, each published elsewhere on its own cadence.
Decide
06
A model on the SDoC route needs no signature; 47 CFR 2.1077(a)(3) still requires a US responsible party.
07
A company is sold or merged, and 47 CFR 2.909(e) passes responsible-party status to the new entity.
Out
08
A Cyber Trust Mark filing is voluntary, and 47 CFR Part 8, Subpart B is where its rules sit.
09
Execute write actions only inside the approval boundaries agreed during implementation.
→Product statement
The agent assembles the file and tracks the listings; a named person signs the certification under 47 CFR 2.911(d) and files it, and the applicant answers for it.
Example workflow
One model, grant to certification
AgentHuman
1Listing change publishedPSHSB Public Notice, or a BIS, DHS, DoD or Treasury list update
2Authorization file assembledGrant, TCB, test lab and its ownership evidence, responsible party, US agent and each module grant
3Listing version recordedThe notice, its DA number and the date each list was read
4Controls appliedRe-certification checks, US-agent checks, module-grant checks and completeness confidence
No human action required
Stages 1 to 4 run unaided, and nothing is certified at any of them — the agent is assembling, and the regulatory lane opens at the completeness gate.
5DecisionBranches at the completeness gate
File complete
Goes to the regulatory manager to sign.
Anything thin
Adds a regulatory counsel read first.
Regulatory review
The file is held with its listings, its grants and its gaps.
Sign the certification · Append evidence · Send to counsel
Signed and filed — by a named person▼
6Authorization records updatedOnly where write access and disclosure policy allow it
7Outcome evaluatedListing currency, evidence completeness, counsel corrections and what a later review found
Corrections
Each counsel correction is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required8 items
Certifying that equipment is not prohibited.
Signing or filing anything with a TCB.
Declaring an applicant off the Covered List.
Telling a buyer a model is still authorized.
Automation boundaryAgent acts unaided
✓Assemble the authorization file for each model and each grant on record.
✓Read the PSHSB notices, not the Covered List webpage.
✓Check the designated US agent still resolves to a live address.
✓Draft the re-certification the moment a listing moves.
Nothing is certified or filed except by a named signer, inside the agreed boundaries.
Deciding an entity is not under prohibited control.
Reading a Conditional Approval as an exemption.
Saying whether Cyber Trust Mark submissions are open.
Changes to listing rules, checks or certification text.
Example output
One model, annotated
FCC 24-122 turned on a US agent mailbox closed since 2019, and the file is what a person signs from.
Authorization file · single modelIllustrative example
Model
Filed as
Listing read
Evidence of record
Confidence
Held for
Wireless router, current grant
Certification, TCB grant, module grants attached
DA 26-278, 23 March 2026
PSHSB Public Notice, read that day
Held uncertified
The regulatory manager, in person
As receivedTaken from the PSHSB notice and the grant record — nothing on this side is decided by the agent.
What the file holdsThe TCB grantUS agent designationModule grant records
Why no certification hereFCC 26-2 reaches licence holders, not equipment authorization applicants.
ActionSign the certificationAppend evidenceSend to counsel
What the score decidesBelow the configured threshold the file picks up a counsel read before.
Value
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value landsValue 01 – 04
Every modelFrom the authorization record
03Evidence
One country, one authorization
Certificate expiry and in-country representatives belong to our type-approval agent; this page stays on the US authorization and the Covered List.
01Approved path
Which list moved, and when
DA 25-1086 listed foreign-produced UAS on 22 December 2025 and DA 26-786 added power inverters on 28 July 2026 — categories, not companies.
02Human review
What changed, and what did not
FCC 25-27 put the new certifications on TCBs, labs and accreditation bodies; the 2026 forfeiture maxima did not rise, per 91 FR 39613.
04Build an evidence trail
The grant, the list version read against it and the signer who certified stay on the file.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Listing sourcesPSHSB Public Notices BIS · DHS · DoD · Treasury lists
Authorization recordsFCC ID grants · TCB records Test reports · lab accreditation
Product and supply recordsPLM · bill of materials Module grants · supplier records
Agent
Equipment authorization & covered list
Reads the listings Builds the file Holds for the signer
Corporate and entity recordsOwnership · entity registers US agent designations
A line-level listing-provenance figure can read clean while one product line absorbs most of the corrections. Nestack reports the counsel-correction rate by product line, not only in total.
Slice performance — reported separately, not only in aggregateIllustrative example
Slice
Failure rate
Lift
Lift vs. threshold
Status
Category-listed product lines
9.5%
3.7×
Review
Lines with third-party modules
6.9%
2.7×
Review
Consumer wireless lines
4.3%
1.7×
Watch
Certified industrial lines
1.6%
0.6×
Normal
Bar: counsel-correction-rate lift vs. certified industrial baseline · scale 0–4.0× · tick marks the 2.0× review threshold2 of 4 slices over threshold
Evidence-linked improvement
What an unreconstructable file costs
The loop shuts when the stale list page is a regression case. That suite is what the next grant checked is measured against.
Improvement cycle · five stagesSwitchback — the path turns at Improve and returns at Learn
01Detect
Counsel-correction rate rises in one product line.
02Diagnose
The page that had said September 2024 for two years is read back against the notices until one cause remains.
03Improve
Any change goes out numbered, with the listings that caused it attached.
04Verify
One grant case still failing is enough to hold the release back.
05Learn
One case joins the suite, one line joins the listing record.
Learn → DetectThe return edge. The next grant is measured against a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, file assembly, evaluation, integration, then production validation and handover.
WorkstreamWeek 1Week 2Week 3Week 4Week 5Week 6
01Authorization-file discovery and boundary work.
02Grant, PLM and entity-register sources.
03Listing-source, module-grant and US-agent mapping.
04Grant ingestion and file normalisation.
05Module, module-grant and supplier binding.
06Completeness scoring and counsel routing.
07Signer certification workflow.
08Authorization-record integration.
09Listing and grant cases.
10Guardrails and certification controls.
11Grant-trail instrumentation.
12Deployment, documentation and Agent Care handover.
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallelFinal scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
Capability✓ in scope · — not at this tierPilotOne product line, one routeProductionProduction authorization recordsAdvancedMultiple lines / routes
Introduced at Pilot
File assembly to your rules✓✓✓
Named-signer certification✓✓✓
Listing-provenance baseline✓✓✓
Introduced at Production
Reporting by product line—✓✓
Certification workflow in your systems—✓✓
Approved write-back—✓✓
Authorization-record integration—✓✓
Introduced at Advanced
Multi-list screening duties——✓
Cross-line evidence packs——✓
High model volume——✓
Multi-list screening controls——✓
Build priceFrom $5,000From $8,000Custom quote
Final build priceConfirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
Separate from buildBuild pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bringWe build with it
01Your model list and grant records→Grant ingestion and module mappingWeek 1
02Representative grants and notices→File baseline, listing binding and evidence captureWeek 2
03Your listing sources and signers→Listing-source, module-grant and US-agent mapping and the automation boundaryWeek 1
04Access to relevant APIs, feeds or exports→Grant, PLM and entity-register assessment, then integration setupWeek 2
05Grants you would not want re-read→Listing cases and the evaluation suiteWeek 4
06What no certification may imply→Completeness scoring, counsel routing, guardrails and certification controlsWeek 3
07A named regulatory manager to sign→Signer certification workflow, then pilot and production validationWeeks 5–6
Nothing else is requiredDeployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
Width here is worked time rather than layout space, which is why two bands have to share the fifth week.
PhaseW1W2W3W4W5W6
DiscoveryW1
BuildW2 – W3
EvaluateW4 – W5
Pilot & LaunchW5 – W6
Week focusW1Authorization workflow discovery, listing mapping and the automation boundaryW2Source integration and the grant baselineW3File assembly, listing logic and certification controlsW4Evaluation suite, listing cases and failure-mode testingW5Authorization-record integration, pilot models and targeted correctionsW6One authorization cycle run under the regulatory manager, then Agent Care handover
Reading the bandA bar covers only the weeks its own work is named in. The doubled fifth week is real work, not padding.
At the end of W6Once the authorization file validates, Agent Care assumes the agent.
DurationSix-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Electronics AI agent
Build an equipment authorization agent around a list that moves without notice.
Show us how a grant reaches you today and which list you read on 1 October. Under 47 CFR 2.911(d)(6) a named person at the applicant signs each new certification a Covered List change forces, and the file behind that signature is read back long afterwards.